Customization: | Available |
---|---|
After-sales Service: | 2 Years |
Type: | Welded Wire Mesh Machine |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Welded Equipment Machinery Fence Panel Wire Roll Mesh Welding Making Machine
Model | DP-FP-2500BN |
Wire diameter | 3-6mm |
Line wire space | 50-300mm |
Cross wire space | Min. 50mm or Min. 25mm |
Mesh width | Max. 2.5m |
Mesh length | Max. 100m |
Welding speed | 50-75 times/min |
Reinforcing Mesh Welding Machine
Model | DP-FP-2500A+ | DP-FM-3000A+ | DP-GW-2500B | DP-GW-3000B |
Air cylinder type | SMC 80 double-acting air cylinder | SMC 90 single-acting bally air cylinder | ||
Wire diameter | 3-8mm | 5-12mm | ||
Longitude wire space | 100-300mm | 100-300mm | ||
Cross wire space | Min. 50mm | Min. 50mm | ||
Mesh length | Max. 12m | Max.12m | ||
Mesh width | Max. 2.5m | Max. 3m | Max.2.5m | Max.3m |
Welding speed | Max. 100times/min | Max. 80-100times/min |
Model | DP-FP-2500A | DP-FP-3000AN | DP-FP-3200A+ |
Wire diameter | 3-6mm | ||
Line wire space | 50-300mm | 50-300mm | 76.2-300mm |
Cross wire space | Min. 25mm | Min. 25mm | Min. 12.7mm |
Mesh width | Max. 2.5m | Max.3m | Max.3.2m |
Mesh length | Max. 3.2m | Max. 3m | Max.4m |
Welding speed | Max. 70times/min | Max. 60times/min | Max. 130times/min |
Bending way | Manual | Automatic | Manual |
Model | DP-AW-1200H/E | DP-AW-1500H/E | DP-AW-1600H/E |
Wire diameter | 2-3.5mm/2-4mm | ||
Longitude wire space | Mostly 50-200mm(If min. 25*25mm, we can also design) | ||
Cross wire space | Min. 25mm or smaller (PLC control) | ||
Mesh width | Max. 1200mm | Max. 1500mm | Max. 1600mm |
Welding speed | Max. 150times/min |
Model | DP-DNW-2 | DP-DNW-3 | DP-DNW-4 |
Wire diameter | 0.65-2mm | 1-2.8mm | 1-3.5mm |
Line wire space | 12.5mm, 25mm, 50mm | 25, 50, 75, 125, 150mm | 25-150mm |
Cross wire space | 12.5mm, 25mm, 50mm | 12.5, 25, 50, 75, 100, 125mm | 25-150mm |
Mesh width | 1.2m, 1.5m, 1.8m, 2m | 1.5m, 1.8m, 2m, 2.5m | 1.2m, 1.5m, 1.8m, 2m |
Welding speed | Max. 120-180times/min | Max. 60-100times/min | Max. 60-100times/min |
Main motor | 2.2/4/5.5kw | 5.5/7.5kw | 5.5/7.5kw |
(Japan) PLC (Taiwan) touch screen (France) low-voltage apparatus (Switzerland Sweden) switch (France) air switch (Japan) power supply (Taiwan) inverter (South Korea) encoder (Japan) servo drive |
Q:Where is your factory located?
A: Our factory is located in Anping county, Hebei Province of China. The nearest airport is Beijing airport or Shijiazhuang airport. We can pick you up from Shijiazhuang city.
Q: How many years are your company engaged in the wire mesh machines?
A: More than 25 years. We have our own technology develop department and testing deparment.
Q: Can your company send your engineers to my country for machine installation, worker training?
A: Yes, our engineers went to more than 100 countries before. They are very experienced.
Q: What's the guarantee time for your machines?
A: Our guarantee time is 2 years since the machine was installed in your factory.
Q: Can you export and supply the customs clearance documents we need?
A: We have much experience for exporting. And we can supply the CE certificate, Form E, p
A: Our factory is located in Anping county, Hebei Province of China. The nearest airport is Beijing airport or Shijiazhuang airport. We can pick you up from Shijiazhuang city.
Q: How many years are your company engaged in the wire mesh machines?
A: More than 25 years. We have our own technology develop department and testing deparment.
Q: Can your company send your engineers to my country for machine installation, worker training?
A: Yes, our engineers went to more than 100 countries before. They are very experienced.
Q: What's the guarantee time for your machines?
A: Our guarantee time is 2 years since the machine was installed in your factory.
Q: Can you export and supply the customs clearance documents we need?
A: We have much experience for exporting. And we can supply the CE certificate, Form E, p